The auditorium makeover planning committee has been meeting with several companies to work out the details for the makeover. This week Little Mountain Production sent a preliminary drawing of the specs that the construction manager will need. After looking at the drawings, we noticed a few changes to recommend, such as widening a few back entrances that will make loading of equipment much easier in the future. Additionally, there the baptismal tank was missing from the drawing!
We also recieved a full proposoal from the technical company that will be working on the installation audio, lighting, and other technical equipment. Next week we will work on combining both proposals and develop a time line.